*Plan not certified by a professional engineer
*Written procedures and a record of inspections are not made part of the plan.
*Visual tank inspections are not conducted periodically by appropriate personnel and/or inspections do not include tank foundation and supports.
*Above ground valves and pipelines are not examined periodically on a scheduled basis for general condition (includes items, such as: flange joints, valve glands 2nd bodies, drip pans, pipeline supports, bleeder and guage valves, polish rods/stuffing box.