← EPA enforcement cases

INDUSTRIAL PARK DEVELOPMENT CORP.

Judicial · FY1985 · — · Final Order With Specified Cost Recovery · 9820

Penalty
$250K
Cost recovery
Compliance action

Case

Case Number
03-1985-0019
Type
Judicial
Lead
EPA
Outcome
Final Order With Specified Cost Recovery
DOJ Docket
90-11-3-102
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

THE ABM-EDDYSTONE SITE IS LOCATED IN A MIXED INDUSTRIAL/ RESIDENTIAL AREA BETWEEN RT 291 & THE DELAWARE RIVER IN THE BORO OF EDDYSTONE, DELAWARE COUNTY, PA. THE SITE IS AN ABANDONED DUMPSITE APPROXIMATELY 5.5 AC IN AREA. AT THE TIME THAT EPA DECIDED TO TAKE ITS REMOVAL RE- SPONSE THE SITE CONTAINED MORE THAN 200 DRUMS, A PARTIALLY FULL TANKER TRUCK OF APPROXIMATELY 2000 GAL CAPACITY, SLUDGE IMPREGNATED & STAINED SOILS AROUND LEAKING & DETORIATING 55 GAL DRUMS, & AN ASSORTMENT OF SMALLER CONTAINERS. DAVID DOLGENOS, RONALD ALTMAN & NORMAN M. FEINBERG TRAD- ING AS IPDC ARE THE CURRENT OWNERS OF THE SITE & HAVE BEEN OWNERS SINCE 1971. IN 6/77, IPDC ENTERED INTO A LEASE W/ABM DISPOSAL SERVICE CO., INC., WHEREUNDER ABM WAS PERMITTED TO STORE TANK TRUCKS & TRAILERS AT THE SITE. ABM STORED THE WASTES ON THE SITE & SUBSEQUENTLY ABANDONED THOSE WASTES. ABM THEN FILED FOR BANKRUPTCY & ITS ASSETS WHERE PLACED INTO RECEIVERSHIP. A SITE INVESTIGATION BY THE EPA REG III FIELD INVESTIGA- TION TEAM IN 8/83 & SUBSEQUENT ANALYSES OF SITE INVESTIGA- TION SAMPLES SHOWED THE PRESENCE OF CARCINOGENIC & EXTREMELY TOXIC MATERIALS IN THE DRUM & THE SOIL. A FIELD INVESTIGA- TION BY EPA & NOAA ON 10/30/84 CONFIRMED THE PRESENCE OF TOXIC SUBSTANCES & IDENTIFIED EXTREMELY CORROSIVE WASTES ON THE SITE. HAZARDOUS SUBSTANCES FOUND IN THE CONTAINERS AND/ OR THE SOIL AT THE SITE INCLUDED TRICHL

Source

Authoritative
EPA ECHO