← EPA Federal Register rules

Modification of National Pollutant Discharge Elimination System (NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas Construction Activity That Disturbs One to Five Acres of Land

water-quality · Rule · Published 2003-03-10 · Effective 2003-03-10 · 68 FR 11325

Document

Document number
03-5708
Federal Register citation
68 FR 11325
CFR reference
40 CFR 122
Type
Rule
Action
Final rule.
Category
water-quality
Publication date
2003-03-10
Effective date
2003-03-10
EPA docket
FRL-7464-2

Abstract

Today's action postpones until March 10, 2005, the requirement to obtain National Pollutant Discharge Elimination System (NPDES) storm water permit for oil and gas construction activity that disturbs one to five acres of land. On December 8, 1999 (64 FR 68722), the U.S. Environmental Protection Agency (EPA) published a final rule expanding the then-existing NPDES permitting program to require permit coverage by March 10, 2003 for, among other things, construction sites that disturb one to five acres. As part of that rulemaking, EPA assumed that few, if any, oil and gas exploration, production, processing, or treatment operations or transmission facilities would be affected by the rule. Since rule promulgation, EPA has become aware that close to 30,000 oil and gas sites per year may be affected by the December 8, 1999, storm water regulations. The two-year postponement of the deadline from March 10, 2003, to March 10, 2005, will allow time for EPA to analyze and better evaluate: the impact of the permit requirements on the oil and gas industry; the appropriate best management practices for preventing contamination of storm water runoff resulting from construction associated with oil and gas exploration, production, processing, or treatment operations or transmission facilities; and the scope and effect of 33 U.S.C. 1342 (l)(2) and other storm water provisions of the Clean Water Act.