Approval and Promulgation of Implementation Plans; Washington: Nonattainment New Source Review
air-emissions · Rule · Published 2014-11-07 · Effective 2014-12-08 · WA · 79 FR 66291
Document
Document number
2014-26451
Federal Register citation
79 FR 66291
CFR reference
40 CFR 52
Type
Rule
Action
Final rule.
Category
air-emissions
Publication date
2014-11-07
Effective date
2014-12-08
State
WA
EPA docket
EPA-R10-OAR-2014-0343
Abstract
The Environmental Protection Agency (EPA) is approving revisions to the Washington State Implementation Plan (SIP) that were submitted by the Department of Ecology (Ecology) on January 27, 2014. These revisions update the preconstruction permitting regulations for large industrial (major source) facilities located in designated nonattainment areas, referred to as the Nonattainment New Source Review (major nonattainment NSR or major NNSR) program. While these revisions update Ecology's major NNSR program generally, the most significant change is the incorporation of regulations to implement major NNSR for fine particulate matter, particles with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers (PM<INF>2.5</INF>). The major NNSR program is designed to ensure that major stationary sources of air pollution are constructed or modified in a manner that is consistent with attainment and maintenance of the National Ambient Air Quality Standards (NAAQS).