← EPA Federal Register rules

Approval and Promulgation of Implementation Plans; Washington: Prevention of Significant Deterioration and Visibility Protection

other · Rule · Published 2015-04-29 · Effective 2015-05-29 · WA · 80 FR 23721

Document

Document number
2015-09889
Federal Register citation
80 FR 23721
CFR reference
40 CFR 52
Type
Rule
Action
Final rule.
Category
other
Publication date
2015-04-29
Effective date
2015-05-29
State
WA
EPA docket
EPA-R10-OAR-2014-0755

Abstract

The Environmental Protection Agency (EPA) is approving revisions to the Washington State Implementation Plan (SIP) that were submitted by the Department of Ecology (Ecology) on January 27, 2014. These revisions implement the preconstruction permitting regulations for large industrial (major source) facilities in attainment and unclassifiable areas, called the Prevention of Significant Deterioration (PSD) program. The PSD program in Washington has been historically operated under a Federal Implementation Plan (FIP). This approval of Ecology's PSD program narrows the FIP to include only those few facilities, emission sources, geographic areas, and permits for which Ecology does not have PSD permitting jurisdiction or authority. The EPA is also approving Ecology's visibility protection permitting program which overlaps significantly with the PSD program.

Source

Authoritative
Federal Register document
Machine
JSON-LD · Markdown