← EPA Federal Register rules

Air Plan Approval; GA and TN; Interstate Transport (Prongs 1 and 2) for the 2010 1-Hour NO2 Standard

air-emissions · Rule · Published 2019-05-17 · Effective 2019-06-17 · 84 FR 22374

Document

Document number
2019-10187
Federal Register citation
84 FR 22374
CFR reference
40 CFR 52
Type
Rule
Action
Final rule.
Category
air-emissions
Publication date
2019-05-17
Effective date
2019-06-17
EPA docket
EPA-R04-OAR-2018-0720, EPA-R04-OAR-2018-0759

Abstract

The Environmental Protection Agency (EPA) is approving State Implementation Plan (SIP) revisions submitted by the State of Georgia, through the Georgia Environmental Protection Division (Georgia EPD), via a letter dated July 24, 2018, and the State of Tennessee, through the Tennessee Department of Environment & Conservation (TDEC), via a letter dated May 14, 2018, for the purpose of addressing the Clean Air Act (CAA or Act) "good neighbor" interstate transport (prongs 1 and 2) infrastructure SIP requirements for the 2010 1-hour Nitrogen Dioxide (NO<INF>2</INF>) National Ambient Air Quality Standard (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, commonly referred to as an "infrastructure SIP." Specifically, EPA is approving these SIP revisions addressing prongs 1 and 2 to ensure that air emissions in each of these two states do not significantly contribute to nonattainment or interfere with maintenance of the 2010 1-hour NO<INF>2</INF> NAAQS in any other state.

Source

Authoritative
Federal Register document
Machine
JSON-LD · Markdown