Transition information systems and common controls to an ongoing authorization process (when eligible for such a process) with the formal approval of the respective authorizing officials or reauthorize information systems and common controls as needed, on a time or event-driven basis in accordance with agency risk tolerance, as required by OMB Circular No. A-130 and SOP 90 47 6.