While operating 401RB on Rt Side of Unit 2, Entry #9, Inby Spad Location 7+90 IE drilled approx 4' with starter steel then dropped boom to couple extension steel. After coupling steels IE raised boom to seat extension steel into the chuck. IE slipped on a rock and pushed joystick into Up position causing it to strike their hand